Why the forwarder asks for documents the day after you pay
A 10 kWh battery is Class 9 dangerous goods. The cell chemistry is safe in normal use, but the transport system does not care about chemistry — it cares about paperwork. So the sequence is predictable: you sign the PO, the deposit clears, and then the freight forwarder sends a list. UN38.3 test summary, MSDS, sea transport declaration, and increasingly a dangerous goods packing certificate.
If the supplier cannot produce those for the exact model on the invoice, the container does not sail. It sits in the port while the vessel leaves, and the demurrage lands on the buyer.
Here is what each document actually is, and what to check before you accept it.
What the four core documents do
- UN38.3 test summary — proof that the cell or battery passed the eight tests in the UN Manual of Tests and Criteria (altitude simulation, thermal cycling, vibration, shock, external short circuit, impact/crush, overcharge, forced discharge). The summary is the one-page document forwarders accept; the full report sits behind it.
- MSDS / SDS — the safety data sheet, 16 sections, describing composition, hazards, first aid, handling and transport classification. Forwarders read section 14 for the UN number and packing group.
- Sea transport / dangerous goods declaration — the shipper’s declaration that the consignment is packed, marked and labelled according to the IMDG Code.
- 1.2 m drop test and stacking test — required for the packaging, not the battery. These are the ones suppliers most often skip, and the ones inspectors ask for when a container is opened.
The mistake that costs the most: report does not match the model
A UN38.3 summary is issued for a specific battery — specific cell, specific configuration, specific watt-hour rating. A supplier who forwards you a report for a 24 V 100 Ah pack does not thereby have a report for the 51.2 V 200 Ah pack you ordered.
Customs and carriers do check. When the model on the report, the model on the invoice and the model on the carton disagree, the shipment is held.
This is also why “we have UN38.3” is not a useful answer to the question. The useful answer is: which report number, for which model, with which watt-hour rating, issued by which laboratory.
Five things to check on a UN38.3 summary
- Applicant name — should be the company selling you the battery, not a trading company three steps removed. If it is a different legal entity, ask why.
- Model and watt-hour rating — must match your PO exactly, including the suffix.
- Laboratory and accreditation — CNAS, or an ILAC-recognised body. The report number should be traceable.
- Test date and standard revision — a report from 2015 against an older revision may not be accepted.
- All eight tests, with results — T1 through T8. A summary that lists six tests is incomplete.
What we hold, and what we send
We keep current reports for our three main battery families — the 2478-100 W portable power station, the 3212 pack and the 6412 pack — covering UN38.3, MSDS, sea transport, dangerous goods classification, 1.2 m drop and stacking. Twelve documents in total, all issued to Zhongshan Kangjun New Energy Technology Co., Ltd.
They are published as page-one images on our About page, and the full PDFs open from each card. If your forwarder needs a specific document for a model you are ordering, ask and we will send the exact file — not a sample from another product.
Before you book the vessel
Ask for the four documents in the quote stage, not after the deposit. Check that the model string matches. Confirm the watt-hour rating. And keep a copy of the full UN38.3 report, not only the summary — the summary gets you through booking; the full report is what gets you through an inspection.
By the Kangjun engineering team · Last updated: 30 October 2026