Installation Preparation Checklist

Everything an installer should confirm before the pack arrives — location, structure, cabling, protection and commissioning information.

Most installation call-outs are decided before the technician arrives: a wall that cannot carry the weight, a cable that is one size too small, or a commissioning form nobody filled in. Work through this list at survey stage.

Location and structure

Check Target Why it matters
Ambient temperature 0 – 40 °C, shaded Charging below 0 °C is blocked by the BMS; above 40 °C accelerates ageing
Enclosure Indoor or IP54 cabinet; no direct rain Terminals and comms ports are not weatherproof
Wall / floor strength ≥ 2× pack weight A 16 kWh pack with bracket is roughly 160 kg
Clearance 150 mm sides, 300 mm top Heat dissipation and service access
Distance to inverter ≤ 2 m DC run Voltage drop and cable cost

Electrical

Item Specification Note
DC breaker 1.25 × continuous current, 125–250 A DC-rated, not an AC MCB
Cable 35 mm² up to 3 m at 100 A; 50 mm² above Both poles fused or breaker-protected
Grounding Pack earth to installation earth bar Continuity tested before energising
BMS comms cable Shielded, pin-out per inverter model One end of shield grounded only
Surge protection Type 2 AC SPD on the inverter output Lightning-prone regions

Documentation to hand over

  • Single-line diagram showing battery, breaker, inverter and earthing.
  • Load list with measured standby and peak current.
  • Commissioning sheet: firmware version, protocol selected, absorption and cut-off values, first full-charge date.
  • Serial numbers of every pack, photographed on the label.

First power-on sequence

  1. Measure pack voltage at the terminals — a healthy 51.2 V pack reads 52–53 V at 50 % state of charge.
  2. Check polarity and torque (typically 8–10 N·m on M6 terminals).
  3. Close the DC breaker, then start the inverter and confirm the BMS shows current in the expected direction.
  4. Run one full charge to 100 % so the BMS learns the top of the curve; state-of-charge readings are unreliable before that.
If the site has no grid and the inverter is off-grid only, confirm the inverter can start from the battery without PV. Some hybrid models need PV or grid to boot and will not black-start from a pack.