What to Include in a Project Inquiry
Nine fields turn a vague request into a quotable project. Send them together and we return a configuration, a price and a lead time in one reply.
The nine fields
| Field | Example | Why we need it |
|---|---|---|
| Destination market | Nigeria / Chile / Kazakhstan | Decides certification route and plug standards |
| Application | Home backup / off-grid / commercial | Changes DoD, cycle life and enclosure |
| Capacity or daily load | 10 kWh/day, 8 h backup | Sizes the pack instead of guessing |
| Quantity | 100 units trial, 500 / year | Sets MOQ, price tier and production slot |
| Inverter brand & model | Deye SUN-5K-SG03LP1 | Confirms protocol, pin-out and voltage settings |
| Certification needed | SONCAP, SASO, EAC, INMETRO, SNI | Adds 2–4 weeks to the schedule |
| Trade terms | FOB Shenzhen / CIF Lagos | Changes the quote basis and packaging |
| Branding & packaging | Logo print, retail carton, manual language | Quoted as a separate tooling line |
| Target date | Container by 20 December | Determines whether we quote stock or a production run |
A copy-paste inquiry that gets answered first
Market: ______ · Application: ______
Capacity or daily kWh: ______ · Quantity: ______
Inverter brand + model: ______
Certification required: ______ · Trade term: ______
Branding: logo print? carton design? manual language?
Target shipment date: ______
Capacity or daily kWh: ______ · Quantity: ______
Inverter brand + model: ______
Certification required: ______ · Trade term: ______
Branding: logo print? carton design? manual language?
Target shipment date: ______
What happens next
- Within one working day — we confirm the model, the protocol and a price band.
- Within three days — formal quotation with packing data, container loading plan and certification status.
- Sampling — 5–7 working days for a branded sample once artwork is approved.
If the configuration is still open, the sizing guide and the inverter matching guide answer the two questions that block most quotations.
Send your project details
One message with the nine fields above is enough for a firm answer.