What to Include in a Project Inquiry

Nine fields turn a vague request into a quotable project. Send them together and we return a configuration, a price and a lead time in one reply.

The nine fields

Field Example Why we need it
Destination market Nigeria / Chile / Kazakhstan Decides certification route and plug standards
Application Home backup / off-grid / commercial Changes DoD, cycle life and enclosure
Capacity or daily load 10 kWh/day, 8 h backup Sizes the pack instead of guessing
Quantity 100 units trial, 500 / year Sets MOQ, price tier and production slot
Inverter brand & model Deye SUN-5K-SG03LP1 Confirms protocol, pin-out and voltage settings
Certification needed SONCAP, SASO, EAC, INMETRO, SNI Adds 2–4 weeks to the schedule
Trade terms FOB Shenzhen / CIF Lagos Changes the quote basis and packaging
Branding & packaging Logo print, retail carton, manual language Quoted as a separate tooling line
Target date Container by 20 December Determines whether we quote stock or a production run

A copy-paste inquiry that gets answered first

Market: ______ · Application: ______
Capacity or daily kWh: ______ · Quantity: ______
Inverter brand + model: ______
Certification required: ______ · Trade term: ______
Branding: logo print? carton design? manual language?
Target shipment date: ______

What happens next

  1. Within one working day — we confirm the model, the protocol and a price band.
  2. Within three days — formal quotation with packing data, container loading plan and certification status.
  3. Sampling — 5–7 working days for a branded sample once artwork is approved.

If the configuration is still open, the sizing guide and the inverter matching guide answer the two questions that block most quotations.

Send your project details

One message with the nine fields above is enough for a firm answer.

Request a quote